Demolition of the existing single storey building has beenĬompleted, and demolition impacts have not been covered in the EIA in detail. InĪddition, the EIA would also consider other construction phase and operational phaseĪctivities such as waste management, energy and water supply although they are not directly The main objective of the EIA is to identify potential impacts of excavation, construction ofįoundation and dewatering and consider mitigation measures that may be adopted. The EIA Regulations of the Maldives and all amendments to it up to date. EIA is requiredįor buildings with basements or foundations that are laid below 1.8m from the ground, as per The project is proposed by the land owner, Mohamed Shafiu of H. This report discusses the findings of an Environmental Impact Assessment (EIA) carried outįor the proposed 11-storey building including an underground basement at H. Environmental impact assessment multi-storey building at H. Policy administrative and regulatory framework Please use this identifier to cite or link to this item:Įnvironmental impact assessment multi-storey building at H.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |